SEYDİŞEHİR- 13th AREA BORDER ALACABEL TUNNEL CONSTRUCTION

Name of the Project: Between Seydişehir-13BlHd State Highway Km:27+000 and 37+900(G)/70+228(İ)-61+910 Alacabel Tunnel and Its Access Roads and Soil Grading, Art structures, Bridge, Tunnel and Concrete Compacted Road Construction.
Date of the Contract: May 18th, 2016
Related Institution: TR Highway Authority 13th Regional Directorate, Konya
The tunnel is 19 thousand 200 meters; 7 thousand 360 meters is dublex tube tunnel and 11 thousand 800 meters is divided road. Also, witihn the scope of the project, there are three junctions one of which is with a bridge. There are 9 bilateral turnouts and emergency crossovers between the tunnels.
Within the scope of the project, 1 million 430 thousand m3 tunnel excavation via the new Austrian method, 2 million 950 thousand m3 borrowed pit, split and lateral borrow excavation, 430 thousand tons of plantmix base and subbase, productions such as 145 thousand sqm bituminous hot mix and 3500 tons of bituminous hot foundation will be present.
When Alacabel Tunnel between Antalya-Konya highway is completed, 25 million TL annually in labor force and 17,6 million TL in fuel oil is planned to be saved.