YENİŞEHİR BRIDGE CONSTRUCTION

Date of the Contract: October 31st, 2017
Related Institution: Çarşamba Municipality Civil Works Department
Yeni Şehir Bridge, which is built as a draw bridge on two pillars at the city center, is 164 meters long and 16 meters wide. The bridge which has two towers 34 meters long is going to ease the traffic of the city center with intersections, car and pedestrian roads.