VAN MURADİYE STATE HIGHWAY

Date of the Contract: September 5th, 2017
Related Institution: TR General Directorate of Highways
It includes the construction of 46,9 km long Van-Muradiye state highway as two two-lane road by improwing the standards of the existing road. Also, it is contracted that the road which is with surface dressing is to be built as Bituminous Hot Mix.
In the above mentioned construction work, important items such as 3 milion 350 thousand m3 digging, 1 million 315 thousand tons of plantmix foundation and subbase, 1 million 370 thousand sqm of 21 cm BHM, 55 thousand m3 concrete, 2 thousand 500 tons of iron bars, 120 thousand m3 stone fill, 35 thousand 600 sqm prefabricated concrete parquet construction and 65 thousand 800 m prefabricated concrete curb production are present.