MALATYA 2nd ARMY AVIATION COMMAND   MILITARY AIRPORT CONSTRUCTION

Name of the Project: 2nd Army Aviation Command Maintenance Hangar Construction, Connection Road between Maintenance Hangar and Barracks Main Road (9X40 M), Apron (45X150 M). Taxi Way (20X154 M) New Constructed Building and Facility Needs, Big Maintenance Needs
Date of the Contract: December 29th, 2016
Related Institution: Ministry of Defence General Directorate of Logistics
Within the scope of the work, constructions of environmental security and heat channel, hangar building, cable channels and manhole, sewer line, base drainage, drinking water pipe, tower building, connection roads, car park and landscaping, pist, apron and taxi ways, field drainage, transformer-generator building, rain water deplacement, fire building water depot and landscape, subterranian drainage, field and substructure, runway lighting, runway electrical substructure and transformer installation are found.
The main runway is 2 thousand 318 m and 45 m wide, and 30 tons of straight and ribbed iron bars, 20 tons of welded 59 wire, 170 thousand tons of subbase and base plates are used during the construction. 32 thousand m cbm special concrete (350 doses) and 70 thousand tons of aggregate concrete is used in order to achieve this concrete.